Technical report examining the the main electricity infrastructure on Kiritimati Island. It follows on from the July 2013 study, A Least Cost Analysis of electricity generation options for Kiritimati Island & a joint EU/NZ mission to Kiritimati Island between 18 and 25 September 2013.
Attachements holds the draft & final versions of the report.