Environmental impact assessment done to evaluate the feasibility in installing a maximum of 900kWp PV solar power directly connected to the electricity grid of South Tarawa. Report prepared for the Ministry of Public Works and Utilities of the Republic of Kiribati and the World Bank. Report prepared by TRAMA TECNOAMBIENTAL TTA (Barcelona, Spain).
GN-SEC Secretariat - 26/01/2024
EACREEE - 15/01/2024
SACREEE - 08/01/2024
EACREEE - 15/01/2024
Alessio - 17/05/2024
GN-SEC Secretariat - 03/06/2024
ECREEE - 18/05/2024
ECREEE - 25/04/2024