Renewable Energy Technologies: Cost Analysis Series - Concentrating Solar Power
Concentrating solar power (CSP) plants are capital intensive, but have virtually zero fuel costs. Parabolic trough plant without thermal energy storage have capital costs as low as USD 4 600/kW, but low capacity factors of between 0.2 and 0.25. Adding six hours of thermal energy storage increases capital costs to between USD 7 100/kW to USD 9 800/kW, but allows capacity factors to be doubled. Solar tower plants can cost between USD 6 300 and USD 10 500/kW when energy storage is between 6 and 15 hours. These plant can achieve capacity factors of 0.40 to as high as 0.80.
The energy and climate technology information presented on this website in the form of publications, case studies, tools etc. has been shared by the GN-SEC Members, Knowledge Partners and other experts within the field. The content is for information and educational purposes only and no legal liability or other responsibility is accepted by or on behalf of UNIDO for any misinformation on this site, or any site to which these pages connect. UNIDO accepts no responsibility for any loss, damage or inconvenience caused as a result of reliance on the information provided.